Located in the heart of Leederville, the Foundry is a mixed used development consisting of 40 residential apartments and 4 floors of commercial tenancies. The project was completed in early-2023.

In consultation with the project developer and other stakeholders, Bright Connect was able to significantly reduce the Western Power headworks charge, in addition to designing a community energy network which includes EV charging options for residents.

Bright Connect equipped the building with on-site renewable energy generation along with superfast broadband infrastructure.

Project Benefits

For building occupants:

Cost savings through discounted electricity.

A hassle-free experience with a single invoice for electricity, water, centralised air-con and EV charger usage. 

Option to purchase a private EV charger, installed within residents own car bay.

“Pay as you go” communal EV charging available.

Superfast broadband with symmetrical upload and download speeds.

For the developer:

Solar PV installation designed and funded by Bright Connect.

Significantly reduced Western Power headworks charge.

Reduced metering infrastructure cost.

No NBN development fee.

For Strata:

No metering reading, utility invoicing or collections required.

No electricity price risk.

Discounted electricity for common area usage.